|
|
| |
|
The flaps were completed in February 2004. After completing the rudder and elevator, the flaps were a piece of cake.
|
After the skin is pre-drilled, ribs are lined up inside and drilled.
|
All holes drilled and clecoed for A5 Rivets.
|
Detail of rivets and hinge.
|
Flaps complete!
|
|
|